Bibcode
Núñez-Cagigal, M.; Barr, D.; Barrera, J.; Barreto, M.; Belio, M.; Calzadilla, A.; Carballo, Y.; Connolly, J.; Cózar, J.; Moran, G.; Davies, T.; Dimoudi, S.; Dunn, A.; Feijóo, N.; García-Martín, P.; González-Manrique, S.; Helawae, K.; Hernandez-Delgado, A.; León-Gil, J.; Marcos, A.; Martín-Delgado, Y.; Mato, A.; Martín-Galvez, A.; Merlos, F.; Montoya, L.; Morris, T.; Pérez, A.; Quintero, J.; Rodríguez-Linares, N.; Ruiz de Galarreta, C.; Socas-Navarro, H.; Soler, M.; Soria, E.; Zamora, A.; Collados, M.
Referencia bibliográfica
Ground-based and Airborne Telescopes XI
Fecha de publicación:
8
2026
Número de citas
0
Número de citas referidas
0
Descripción
The European Solar Telescope (EST) will be the largest solar telescope in Europe with a primary mirror of 4.2m in diameter and it will be built in the Observatorio del Roque de Los Muchachos (ORM). EST has been designed to achieve a high polarization sensitivity, high photon throughput, minimal local seeing effects, adaptive optics integrated in the telescope optical train, including an Adaptive Secondary Mirror (ASM), with a classic Adaptive Optics (AO) for the first light configuration. EST will be prepared to progress to Multi-Conjugated Adaptive Optics (MCAO). It includes a science instrumentation suite composed of seven instruments capable of observing simultaneously, covering a wavelength range from 380nm to 2300nm. EST has been designed following sustainable and energy-efficient guidelines. EST has successfully passed its Preliminary Design Reviews (PDRs) structured in seven reviews from October 2024 to December 2025 covering all disciplines. The review panels were composed of a total of 29 international reviewers who had not made previous contributions to EST. During 2026, EST continues implementing the corrective actions identified during the reviews to move forward to the detailed design and construction phases. This paper reports the lessons learned during the reviews, a description of the EST design and the next steps towards the EST construction.